Illuminating the Future Potential from the North Sea

Alex Kemp and Linda Stephen, University of Aberdeen, shed light on the subject of the North Sea oil and gas industry's future.

The current political debate has generated much heat surrounding the future of the North Sea oil and gas industry. This piece attempts to shed light on the subject. The long term future of the industry depends on a combination of (1) the volume of the ultimate resources, including future discoveries, (2) the costs of exploiting these resources, and (3) Government policies (which can incentivise or retard exploration and developments). An understanding of all of these is necessary to come to informed judgements about the long term potential. The Department of Energy and Climate Change (DECC) has recently stated that their best estimate of the remaining recoverable potential is in the range of 11-21 billion barrels of oil equivalent (bn boe). They also see a considerable upside potential, but with much higher associated risks. Another reputable source, Oil and Gas UK, estimates the ultimate recoverable potential within the 15-24 bn boe range.

It is important to note that these estimates have no associated time scale indicating when the resources could be exploited. Nor has detailed economic modelling been conducted to assess whether the fields associated with these resources will be commercially viable.

The present authors have conducted detailed financial modelling of the prospects in the period to 2050. This involves calculations of the pre-tax and post-tax returns to all the sanctioned fields, incremental projects, probable and possible fields, discoveries not yet being assessed, and the fruits of further exploration. Reflecting the current practice of licensees, a conservative oil price of $90 in constant real terms was employed to screen all the field developments. For those discoveries not currently being assessed an average development cost premium of $5 per barrel above those pertaining to current new developments was imposed.

Key results are that cumulative production over the period 2014-2050 could be in the 14-15 bn boe range, depending on the extent of success in implementing Wood Review recommendations regarding production efficiency and access to infrastructure. Further financial modelling has also been undertaken on the possible effects of tax reliefs following the current review. These could incentivise further field developments resulting in a total plausible range of 15-16.5 bn boe over the period to 2050.

The year 2050 is a convenient date at which to stop detailed modelling. But the industry will continue beyond that date. Some existing producing fields such as Clair can confidently be expected to remain viable beyond 2050. Further, in our comprehensive database no fewer than 125 known existing discoveries remain undeveloped at 2050 because they are not commercially viable at the $90 (real) oil price. In aggregate they contain total potential recoverable reserves in the range 2.5-3 bn boe. Some have extremely high costs per barrel and may never be commercially viable. But, even the most bearish commentators on the oil market would agree that by 2050 real oil prices are likely to be much higher, and thus more developments should be triggered by that time, even with the expected reduction in infrastructure availability. At the year 2050 in our model there are also 58 new discoveries made between 2014 and 2045 which contain well over 1 bn boe but are uneconomic. Again, it can be expected that, with higher oil prices, some will become economic.

Over the longer term technological advances can also be expected which will result in rates of oil recovery higher than the present average of around 45%. At the moment there are only a very few active tertiary recovery schemes. Others are certainly possible, and, with sympathetic encouragement from Government, many more could be implemented, relating to schemes such as low salinity waterflood, polymer flood, miscible gas injection and CO2 injection. Recovery factors in the 60%-70% range would make a substantial extra contribution to aggregate production both before and after 2050.

Technological advances have already led to decommissioned fields being reopened. It can confidently be predicted that there will be more of these. Some will utilise producing systems with tanker loading for exporting oil and so reliance on existing infrastructure is reduced. As an example of what could be achieved with new technology the decommissioned Miller field could be reopened, perhaps with a CO2 EOR scheme. It will be recalled that the scheme which was aborted some years ago envisaged extra oil production of around 40 million barrels.

Currently there is a somewhat downbeat sentiment in the UKCS with falling output, exploration at very low levels, and many assets being offered for sale. Historically there have been waves of pessimism and optimism. It is also tempting to extrapolate historic trends. In the later 1980’s the general view was that the fall in oil production from its peak in 1984 would continue unabated, given the reduced prospectivity and high unit costs. The Department of Energy “Brown Book” published in 1988 foresaw a continued production decline into the 1990’s. In the event technological advances, such as long reach horizontal drilling and 3D (and later 4D) seismic, plus cost reductions and favourable tax treatment for new developments, reversed the decline in a fairly spectacular fashion.

In sum, it is quite conceivable that the industry can be prolonged well beyond 2050 at activity levels which, while small by today’s standards, contribute significantly to the national economy. No one can say with any assurance whether or not the long run upper potential of 24 bn boe foreseen by OGUK will be achieved. But policies consistent with this should be put in place.

Comments policy

All comments posted on the site via Disqus are automatically published. Additionally comments are sent to moderators for checking and removal if necessary. We encourage open debate and real time commenting on the website. The Centre on Constitutional Change cannot be held responsible for any content posted by users. Any complaints about comments on the site should be sent to info@centreonconstitutionalchange.ac.uk

Alexander Kemp's picture
Guest post by Alexander Kemp
University of Aberdeen
2nd September 2014
Filed under:

Latest blogs

  • 22nd January 2019

    The UK is increasingly polarised by Brexit identities and they seem to have become stronger than party identities, a new academic report finds. Only one in 16 people did not have a Brexit identity, while more than one in five said they had no party identity. Sir John Curtice’s latest analysis of public opinion on a further referendum finds there has been no decisive shift in favour of another referendum. The report, Brexit and public opinion 2019, by The UK in a Changing Europe, provides an authoritative, comprehensive and up-to-date guide to public opinion on each of the key issues around Brexit. CCC Fellow, Dr Coree Brown Swan contributed a chapter on "the SNP, Brexit and the politics of independence"

  • 22nd January 2019

    In the papers accompanying the draft Environment (Principles and Governance) Bill published at the end of 2018, the UK Government says that it is “exploring opportunities to co-design the final proposals with the devolved administrations.” There are clear benefits in having strong co-operation and collaboration across the UK in the oversight of our environmental law and performance. Yet the challenge of finding a way forward in terms of working together is substantial since each part of the UK is in a different position at present. Given where things stand today, it may be better to accept that a good resolution is not possible immediately and to revisit the issue at a later stage - so long as there is a strong commitment to return and not allow interim arrangements to become fixed. Colin Reid, Professor of Environmental Law at the University of Dundee examines the issues.

  • 17th January 2019

    Richard Parry assesses a memorable day in UK parliamentary history as the Commons splits 432-202 on 15 January 2019 against the Government's recommended Brexit route. It was the most dramatic night at Westminster since the Labour government’s defeat on a confidence motion in 1979.

  • 17th January 2019

    What is the Irish government’s Brexit wish-list? The suggestion that Irish unity, as opposed to safeguarding political and economic stability, is the foremost concern of the Irish government is to misunderstand and misrepresent the motivations of this key Brexit stakeholder, writes Mary C. Murphy (University College Cork).

  • 17th January 2019

    Brexit is in trouble but not because of the Irish backstop, argues the CCC's Michael Keating.

Read More Posts